The series of submerged breakwaters At Sidi Bishr-Alexandria

The series of submerged breakwaters At Sidi Bishr-Alexandria

Project Description:

Constructing Marine Quay from concrete Blocks with length 125 m orthogonal the shore line and 30 m parallel to the shore line, and break water from crushed stones 600 m length.

Project place:

Sidi Bishr (Alexandria).

Project owner:

The Egyptian authority for shore protection.

Related Projects